Punjab College Phool Nagar

A 300 kW on-grid solar system was installed at Punjab College, Phool Nagar. The system is designed to meet the energy needs of the campus, reducing reliance on the grid and supporting stable electricity supply for academic operations.

300KW

Capacity

160HE

Total Area

2024YR

Year Built

WhatsApp Image 2025 05 02 at 12.45.21 AM

Bismillah Rice Mills Nankanah Sahib

A 1 MW on-grid solar system was installed at Bismillah Rice Mills, Nankana Sahib. The system is tailored to support the high energy demands of the milling operations, ensuring efficient power usage and reducing dependency on conventional electricity sources.

1MW

Capacity

160HE

Total Area

2023YR

Year Built

WhatsApp Image 2025 05 02 at 12.46.11 AM

Sitara Petroleum Lahore

50 KW on-grid solar system was installed at Bismillah Rice Mills, Nankana Sahib. The system is tailored to support the high energy demands of the milling operations, ensuring efficient power usage and reducing dependency on conventional electricity sources.

50KW

Capacity

160HE

Total Area

2022YR

Year Built

WhatsApp Image 2025 05 02 at 12.56.24 AM

650 KW Gas & Oil Multiple Sites

A total of 650 kW on-grid solar systems were installed across multiple gas and oil sites. These systems are designed to supplement the energy requirements of operations, improving energy efficiency and contributing to reduced electricity costs across all locations.

650KW

Capacity

160HE

Total Area

2023YR

Year Built